Construction of chlorine dioxide production (chemical island), Northwestern Federal District

Pre-engineering (including Technical concept. CAPEX estimation.).

Timeline:

2024 – present

Confidential
client

Technical audit of the existing sawmill and wood processing plant, Northwestern Federal District

Consulting services.

Timeline:

2024 – present

Confidential
client

Installation of a new paper machine, Southern Federal District

Pre-engineering (including Technical concept. CAPEX estimation).

Timeline:

2023 – present

Confidential
client

Decarbonization project, Siberian Federal District

Consulting services (including CAPEX estimation. Review of technical concept. Review of financial model).

Timeline:

2023 – present

Syktyvkarskiy LPK, JSC

CONSTRUCTION OF GAS BOILER WITH STEAM TURBINE, Northwestern Federal District, Komi Republic, Syktyvkar

Pre-engineering and feasibility study. Engineering surveys and technical inspection of building structures. Laser scanning and 3D object modelling. PROEKT (Permitting) documentation. EIA (OVOS). Technical support during State ecological expertise and non-state expertise of PROEKT (Permitting) documentation and engineering surveys results. Detailed engineering. Author’s supervision services.

Timeline:

2020 – present

Syktyvkarskiy LPK, JSC

Inspection of main equipment at recovery boiler, Northwestern Federal District, Komi Republic, Syktyvkar

Equipment inspection.

Timeline:

2024

Ilim Group, JSC

Inspection of main and auxiliary equipment at recovery boilers, Sibirian Federal District, Irkutsk Region, Bratsk

Equipment inspection.

Timeline:

2024

Confidential
client

Analysis and segmentation of the market for packaging bases, paper tableware, Northwestern Federal District

Consulting services.

Timeline:

2024

Confidential
client

Market research of equipment suppliers for the pulp and paper industry, Volga Federal District

Consulting services.

Timeline:

2024

ProTechEngineering, JSC (main Client – EuroChem, JSC)

Technical re-equipment of the potash plant. Main building with drying and granulation department, Volga Federal District, Perm Krai, Bereznyaki

Preparation of the calculation model of structures and foundations of the main process building.

Timeline:

2023 – 2024

Confidential
client

Construction of an ethane gas processing complex. Gas processing complex, Northwestern Federal District

Detailed engineering of foundations and steel structures for Inlet facilities. Raw gas filtration and heating unit and for for a main pipeline bridge at row materials base. Offshore shipping terminall.

Timeline:

2023 – 2024

Confidential
client

Construction of a biotechnological complex for deep wood processing, Sibirian Federal District

Technical audit of pre-project documentation. Preparation of main technical solutioins for fire protection systems, water intake and outlets.

Timeline:

2023 – 2024

Confidential
client

Technical audit of a plant for the production of wood products (plywood, chipboard, laminated chipboard) and wood processing, Northwestern Federal District

Consulting services.

Timeline:

2023

Confidential
client

Construction of an ethane gas processing complex. Gas chemical complex, Northwestern Federal District

Correction of architectural, water supply and sewerage detailed engineering for the facility Recycling water supply unit as part of BOP facilities.

Timeline:

2023

Ilim Group, JSC

Inspection of main and auxiliary equipment at recovery boilers, Siberian Federal District, Irkutsk Region, Bratsk

Equipment inspection.

Timeline:

2023

Confidential
client

Construction of a new dissolving pulp mill and new sodium chlorate production facility, Siberian Federal District

Pre-engineering (including Technical concept. Market study. CAPEX estimation. Financial model).

Timeline:

2023

Confidential
client

Market research of Chineese equipment suppliers for the pulp and paper industry, Northwestern Federal District

Consulting services.

Timeline:

2022 – 2023

Ilim Group, JSC

PROJECT “BIG UST-ILIMSK“. CONSTRUCTION OF CARDBOARD PRODUCTION”, Siberian Federal District, Irkutsk Region, Ust-Ilimsk

Engineering surveys. FEL 2 study (Pre-engineering) and FEL 3 study. PROEKT (Permitting) documentation. EIA (OVOS). Technical support during State ecological expertise and expertise of PROEKT (Permitting) documentation and engineering surveys results. DIGITAL TWIN CONCEPT. Detailed engineering and Author supervision for New Office building and New Fiberline.

Timeline:

2018 – 2023

Confidential
client

Technical audit of modernisation facilities at an operating pulp and paper mill, Volga Federal District

Consulting services.

Timeline:

2022

Segezha West, JSC

CONSTRUCTION OF PULP MILL, Northwestern Federal District, Karelia Republic, Segezha

Pre-engineering. Engineering surveys and technical inspection of building constructions and buildings. Mill Digital twin concept elaboration. Main engineering solutions. Tender documentation for the selection of process equipment suppliers. PROEKT (Permitting) documentation (including external infrastructure objects). EIA (OVOS) and sanitary protection zone project. Technical support during State expertise expertise of PROEKT (Permitting) documentation and engineering surveys results. Detailed engineering for the open stacked roundwood storage.

Timeline:

2020 – 2022

Taiga Boguchany, LLC

Construction of a biotechnological complex for deep wood processing, Sibirian Federal District, Krasnoyarsk Region, Boguchany

Engineering surveys. Main engineering solutions. Tender documentation for the selection of process equipment suppliers. PROEKT (Permitting) documentation (including external infrastructure objects). EIA (OVOS) and sanitary protection zone project. Technical support during State expertise and State ecological expertise of PROEKT (Permitting) documentation and engineering surveys results. Detailed engineering for foundations for energy objects (energy island, сaustization and lime regeneration work shop, gasifier, lime kiln).

Timeline:

2020 – 2022

Essity, LLC

CONSTRUCTION OF TISSUE FACTORY, Central Federal District, Tula Region, Sovetsk

EIA (OVOS) and public hearings. PROEKT (Permitting) documentation. Technical support during State ecological expertise and expertise of PROEKT (Permitting) documentation and engineering surveys results. Detailed engineering (steel structures) for the first construction stage. PROEKT (Permitting) documentation update during construction period. Technical support during repeated expertise of PROEKT (Permitting) documentation and engineering surveys results by the results of PROEKT (Permitting) documentation update. Technical Client services (including construction supervision and author supervision).

Timeline:

2019 – 2022

UPM-Kymmene Chudovo, LLC

EXTENSION OF PLYWOOD PRODUCTION, EXTENSION OF VENEER PRODUCTION, CONSTRUCTION OF NEW BOILER, EXTENSION OF OFFICE BUILDING, Northwestern Federal District, Novgorod Region, Chudovo

Technical Client services (including construction management, construction supervision).

Timeline:

2018 – 2022

Metso Outotec (Finland) Oy (Main Client – Norilsk Nickel, PJS)

CONSTRUCTION OF SULFURIC ACID PRODUCTION, Siberian Federal District, Krasnoyarsk Krai, Norilsk

Basic engineering and main engineering solutions. CAPEX estimate.

Timeline:

2020 – 2021

Metso Outotec (Finland) Oy (Main Client – Norilsk Nickel, PJS)

PROJECT “BIG COPPER”. CONSTRUCTION OF THE OF A ROASTING-HIGH-MELTING-ELECTROEXTRACTION COMPLEX and CONSTRUCTION OF THE HIGH-GRADE MATTE SEPARATION UNIT, Northwestern Federal District, Murmansk Region, Monchegorsk

Basic engineering and main engineering solutions. CAPEX estimate.

Timeline:

2020 – 2021

Essity, LLC

MODERNIZATION OF TISSUE FACTORY, Central Federal District, Tula Region, Venev

PROEKT (Permitting) documentation. Technical support during State ecological expertise and expertise of PROEKT (Permitting) documentation and engineering surveys results. Technical Client services (including construction supervision).

Timeline:

2019 – 2021

Confidential
client

ECOLOGICAL AUDIT OF THE EXISTING PULP AND PAPER MILL, Volga Federal District

Consulting services.

Timeline:

2020

Confidential
client

Technical and commercial evaluation of an existing pulp mill, Northwestern Federal District

Consulting services.

Timeline:

2020

Mondi SLPK, JSC

CONSTRUCTION OF THE EVAPORATION PLANT, recaustization plant, Northwestern Federal District, Komi Republic, Syktyvkar

Update of PROEKT (Permitting) documentation. EIA (OVOS). Technical support during State expertise and State ecological expertise of PROEKT (Permitting) documentation and engineering surveys results.

Timeline:

2020

Confidential
client

ELABORATION OF DEVELOPMENT PLAN FOR OPERATING MILL, Volga Federal District

Consulting services.

Timeline:

2020

Mondi SLPK, JSC

CONSTRUCTION OF THE EVAPORATION PLANT, VACUUM COMPRESSION UNIT, TALL OIL PRODUCTION PLANT, Northwestern Federal District, Komi Republic, Syktyvkar

PROEKT (Permitting) documentation. Technical support during State expertise of PROEKT (Permitting) documentation and engineering surveys results. PROEKT (Permitting) documentation update during construction period. Production object safety justification. Technical support during State ecological expertise and repeated State expertise of PROEKT (Permitting) documentation and engineering surveys results by the results of PROEKT (Permitting) documentation update.

Timeline:

2018 – 2020

Ilim Group, JSC

RECONSTRUCTION OF HARDWOOD LINE WITH PERIODIC PRODUCTION OF VISCOSE PULP, Siberian Federal District, Irkutsk Region, Bratsk

FEL 2 study (Pre-engineering) and FEL 3 study. PROEKT (Permitting) documentation. Technical support during expertise of PROEKT (Permitting) documentation and engineering surveys results. Detailed engineering. Author supervision.

Timeline:

2017 – 2020

Ilim Group, JSC

WOOD YARD CONSTRUCTION (WOODYARD-4), Siberian Federal District, Irkutsk Region, Bratsk

Engineering surveys and technical inspection of building structures. FEL 3 study. PROEKT (Permitting) documentation. EIA (OVOS). Technical support during expertise of PROEKT (Permitting) documentation and engineering surveys results. Detailed engineering. Author supervision.

Timeline:

2017 – 2020

Mondi SLPK, JSC

CONSTRUCTION OF BARK BOILER WITH STEAM TURBINE, Northwestern Federal District, Komi Republic, Syktyvkar

Pre-engineering and feasibility study. Business plan. Engineering surveys and technical inspection of building structures. Laser scanning and 3D object modelling. PROEKT (Permitting) documentation. EIA (OVOS). Technical support during State expertise of PROEKT (Permitting) documentation and engineering surveys results. PROEKT (Permitting) documentation update during construction period. Technical support during repeated State expertise of PROEKT (Permitting) documentation and engineering surveys results by the results of PROEKT (Permitting) documentation update. Detailed engineering. Author supervision.

Timeline:

2015 – 2020

Confidential
client

ELABORATION OF DEVELOPMENT PLAN FOR OPERATING PAPER MILL, Volga Federal District

Consulting services.

Timeline:

2019

Enel Green Power Rus, LLC

CONSTRUCTION OF WIND POWER PLANT WITH A PLANNED CAPACITY OF 90 MW, Southern Federal District, Rostov Region, Azov

Construction supervision, HSE compliance control.

Timeline:

2019

Confidential
client

Reconstruction of waste water treatment plant. Effluent treatment system, Northwestern Federal District

Detailed engineering.

Timeline:

2019

Ilim Group, JSC

PROJECT “BIG UST-ILIMSK“. CONSTRUCTION OF TEMPORARY STORAGES FOR LARGE-SIZED AND HEAVY EQUIPMENT FOR THE PROJECT “CONSTRUCTION OF CARDBOARD PRODUCTION”, Sibirian Federal District, Irkutsk Regionm Ust-Ilimsk

PROEKT (Permitting) documentation. Technical support during expertise of PROEKT (Permitting) documentation and engineering surveys results. Detailed engineering.

Timeline:

2019

Mondi SLPK, JSC

MODERNIZATION OF WASTE WATER TREATMENT PLANT ON THE EXISTING MILL, Northwestern Federal District, Komi Republic, Syktyvkar

PROEKT (Permitting) documentation. Technical support during expertise of PROEKT (Permitting) documentation and engineering surveys results. Detailed engineering. Author supervision.

Timeline:

2017 – 2019

Tikkurila, LLC

CONSTRUCTION OF PAINT PRODUCTION, OFFICE AND WAREHOUSE FACILITY, Northwestern Federal District, Saint-Petersburg

PROEKT (Permitting) documentation. Technical support during expertise of PROEKT (Permitting) documentation and engineering surveys results. Tender documentation for the selection of general contractor.

Timeline:

2018

Confidential
client

CONSTRUCTION OF PULP MILL, Northwestern Federal District, Vologda Region

Review of equipment supplier documentation for chloride dioxide production including chemicals storage for pulp and paper mill, HAZID analysis.

Timeline:

2018

Projects

Contact us

+7 (812) 325 80 90

info@inproec.com

196006, St.Petersburg, Ligovsky Ave 266, Lit.V.

Sitemap

About us

Services

Projects

Reference list

News

Contact us

Information

Certificates

Policies

Contact
us